Manitowoc MII 302 Dokumentacja Strona 149

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
Przeglądanie stron 148
Part Number STH038 5/12 147
Ice Thickness Check
The ice thickness probe is factory-set to maintain the
ice bridge thickness at 3 mm.
NOTE: Make sure the water curtain/splash shields
are in place when performing this check. It prevents
water from splashing out of the water trough.
1. Inspect the bridge connecting the cubes. It should
be about 3 mm thick.
2. If adjustment is necessary, turn the ice thickness
probe adjustment screw clockwise to increase
bridge thickness or counterclockwise to decrease
bridge thickness. Set a 7 mm gap between the ice
thickness probe and evaporator as a starting
point. Then adjust to achieve 3 mm ice thickness.
3. Make sure the ice thickness probe wire and the
bracket do not restrict movement of the probe
ADJUSTING
SCREW
ICE THICKNESS ADJUSTMENT
3 mm ICE BRIDGE THICKNESS
PLACE 7mm DRILL BIT HERE TO
SET INITIAL GAP
Przeglądanie stron 148
1 2 ... 144 145 146 147 148 149 150 151 152 153 154 ... 181 182

Komentarze do niniejszej Instrukcji

Brak uwag