Manitowoc CVD2075 Dokumentacja

Przeglądaj online lub pobierz Dokumentacja dla Kostkarki do lodu Manitowoc CVD2075. Manitowoc CVD2075 Specifications Instrukcja obsługi

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj

Podsumowanie treści

Strona 1 - Technology

S Model QuietQube®Ice Machineswith CVD®TechnologyInstallation Training

Strona 2 - Overview

Condensing Unit ClearancesCVD675/CVD885/CVD1085/CVD1185/CVD2075Top/SidesThere is no minimum clearance required, although 6” (15.2 cm) is recommended f

Strona 3 - Installation

CVD Rise & DropVerify the Condensing Unit and Ice Machine Head Section are within the guidelines

Strona 4 - Model Numbers

Electrical ServiceRequirements³ All electrical work, including wire routing and grounding, must conform to local, state and national electrical codes.

Strona 5 - Prior to Installation

Head Section Electrical** All conductors must be solid copper wire * Not available on S2070C models.15 amp 15 amp 15 amp #14 Solid CopperConductor 1.1

Strona 6 - ³Location

CVD Electrical50 amp 40 amp #10 Solid Copper Conductor #10 Solid Copper Conductor 40.0 30.0 50 amp 40 amp 208-230/1/60 208-230/3/60 CVD2075 40 amp 25

Strona 7 - Installation Requirements

Verify Head SectionAlways verify that you have received the correct ice machine & condensing unit prior to installingModel Number on Box

Strona 8 - Head Section

Inspection³Remove carton & inspect ice machine and condensing unit for shipping damage

Strona 9 - Location of Condensing Unit

Remove all PanelsSingle Evaporator - Hinged Front Door Removal³ Loosen Screws on the left and right front panels³ Open the left front door 45 degrees

Strona 10 - Condensing Unit Clearances

Remove all PanelsDual Evaporator - Front Panel Removal³ Loosen Screws on the front panel³ The entire front panel lifts up to disengage³ Remove the top

Strona 11 - CVD Rise & Drop

Model/Serial Number LocationBack of Ice MachineInside of Ice Machine

Strona 12 - Electrical Service

³ Compressor, Condenser,Accumulator and HPCV are Outside³ Line Set is: ³ High Pressure Liquid Line³ Low Pressure Suction Line³ Evaporator, Receiver a

Strona 13 - Head Section Electrical

Example Data PlateRefrigerantVoltageManufactured Date Serial Number – NO Date code in new serial numbersModel Number

Strona 14 - CVD Electrical

Warranty RegistrationWebsiteWarranty Registration Form

Strona 15 - Verify Head Section

Level Bin³Thread leveling leg into base of bin³Level the bin to assure the bin door closes and seals properly

Strona 16 - Inspection

³Place the ice machine on top of the bin.³Make sure ice machine is flush with the sides of the bin. Mount on Bin

Strona 17 - Remove all Panels

Ice Machine Wiring³Install strain relief and proper wiring to ice machine head section

Strona 18

Water Connections1” (25.4 mm) min. inside diameter 1” Female PipeThread ------Large CapacityBin Drain 3/4” (19.1 mm) min.inside diameter 3/4” Female P

Strona 19 - Model/Serial Number Location

Water Supply³Do not connect the ice machine to a hot water supply.³If water pressure exceeds the maximum recommended pressure (80 psi), obtain a water

Strona 20 - Example Data Plate

Water Fittings³ Do not apply heat (torch) to the Water Inlet Fitting or Drain Fitting³ Solder Water Connection before installing on ice machine³ Water

Strona 21 - Warranty Registration

Potable Water Supply³Installation with Water Filter³ Install union, additional shut-off is not required³ Copper or plastic tubing may be used³ Refer t

Strona 22 - Level Bin

Potable Water Supply³Water Installation without filter³Install union and shut-off valve

Strona 23 - Mount on Bin

Typical QuietQube System Installation

Strona 24 - Ice Machine Wiring

Head Section Drains³ Install 18” Vent Tubes³Ice Machine & Bin drains must be run separately³ Drains Must:³Be run separately³Have a minimum pitch o

Strona 25 - Water Connections

Roof Penetration³ Prior to installation of the ice machine head section and CVD® condensing unit be sure that the distance between then is within the

Strona 26 - Water Supply

Lift Unit³Trained & qualified personnel are required for rigging and lifting

Strona 27 - Water Fittings

Curb & Pitch Pockets³ The type of curbs and pitch pockets are dependant on the roofing material.³ Contact a roofing company to install the curb &a

Strona 28 - Potable Water Supply

Place Units³ Place condensing units on curb and secure³ An electrician will determine wire size & install disconnect for each condensing unit

Strona 29

Refrigeration System Installation³ The ice machine head section contains refrigerant charge. The ice machine head section contains 3 refrigeration val

Strona 30 - Head Section Drains

CVD Line SetsCVD2075 S2070C CVD1885 S1870C CVD1485CVD1486 S1470C CVD1285 S1200C RC-20 RC-30 RC-50 CVD1185 IB1020C CVD1085 S1000C CVD885 S0850CIB820C R

Strona 31 - Roof Penetration

Line Set Length, Rise & DropLINE SET LENGTH100 feet (30.5 m) Length: The maximum measured length the line set can be. The receiver is designed to

Strona 32 - Lift Unit

Suction Line Oil Traps0 to 20 feet (0 to 6.1 m) Rise: The ice machine head section has one oil trap built in which allows for a maximum condenser rise

Strona 33 - Curb & Pitch Pockets

Line Set Installation³ Route refrigeration tubing³ The maximummeasured length the line set can be is 100’ (30.5 m) (no exceptions)³ The maximum amount

Strona 34 - Place Units

Model NumbersThis training covers the following models:CVD1085SD1072CSY1074CCVD2075SD2072CSY2074CCVD1885SD1872CSY1874CCVD1485SD1472CSY1474CCVD1285SD12

Strona 35

Suction Line Oil Traps0 to 20 feet (0 to 6.1 m) Rise: The ice machine head section has one oil trap built in which allows for a maximum condenser rise

Strona 36 - CVD Line Sets

Secure Line Set³ Secure Line Set as Needed³ Do not crush/compress insulation

Strona 37

Connect the Line SetIce MachineThe line set can be routed for entry through the top or rear of the ice machine head section.³ Top routing requires the

Strona 38 - Suction Line Oil Traps

Connect the Line SetCondensing Unit³ The condensing unit ships from the factory pressurized with a 50/50 mixture of nitrogen/helium. Bleed off pressur

Strona 39 - Line Set Installation

Pressure Test & EvacuateLeave the line set shut off valves closed (front seated). Pressure test the line sets and CVD condensing unit with 150 psi

Strona 40

Open the Valves Prior to StartingOpen The Valves Prior To Starting The Ice Machine.A. Slowly backseat (open-turn counterclockwise) the suction line s

Strona 41 - Secure Line Set

Leak Check the System³ Leak check the new line set connections at the ice machine head section, condensing unit and S trap as well as all factory join

Strona 42 - Connect the Line Set

Insulation Requirements3/8 inch (9.5 mm) 5/8 inch(15.9 mm) 3/4” (19mm) Suction Line 1/4” (7mm) Liquid Line 5/8 inch(15.9 mm) 7/8 inch(22.2 mm) 1/2”(13

Strona 43

Refrigerant ChargeThe ice machine is pre-charged with refrigerant. Additional refrigerant may be required on some models, when the line set length is

Strona 45

Important Information Prior to InstallationWARNINGPERSONNEL INJURY POTENTIALDo not operate equipment that has been misused, abused, neglected, damaged

Strona 46 - Leak Check the System

Installation Checklist³Complete the installation checklist in the Installation, Use & Care Manual

Strona 47 - Insulation Requirements

Complete Installation³Sanitize the Ice Machine³Energize³Verify Water Level³Run 2 Freeze Cycles

Strona 48 - Refrigerant Charge

S Model QuietQube®Ice Machineswith CVD®TechnologyInstallation QuizClick Here to Launch

Strona 49 - Final Set-Up

Verify Components³Bin³Adapters³Kits³LocationNext verify that you have all the correct components for the ice machine that is being installed

Strona 50 - Installation Checklist

Installation RequirementsThe location selected for the ice machine must meet the following criteria. If any of these criteria are not met, select anot

Strona 51 - Complete Installation

Head SectionClearances Top 5” (12.7 cm) is recommended for efficient operation and removal of top cover/servicing.Sides 5” (12.7 cm) is recommended fo

Strona 52

Location of Condensing Unit³ The air temperature must be at least -20°F (-28.9°C) but must not exceed 130°F (54.4°C).³ CVD675/CVD1185/CVD2075 Only - T

Komentarze do niniejszej Instrukcji

Brak uwag