S Model QuietQube®Ice Machineswith CVD®TechnologyInstallation Training
Condensing Unit ClearancesCVD675/CVD885/CVD1085/CVD1185/CVD2075Top/SidesThere is no minimum clearance required, although 6” (15.2 cm) is recommended f
CVD Rise & DropVerify the Condensing Unit and Ice Machine Head Section are within the guidelines
Electrical ServiceRequirements³ All electrical work, including wire routing and grounding, must conform to local, state and national electrical codes.
Head Section Electrical** All conductors must be solid copper wire * Not available on S2070C models.15 amp 15 amp 15 amp #14 Solid CopperConductor 1.1
CVD Electrical50 amp 40 amp #10 Solid Copper Conductor #10 Solid Copper Conductor 40.0 30.0 50 amp 40 amp 208-230/1/60 208-230/3/60 CVD2075 40 amp 25
Verify Head SectionAlways verify that you have received the correct ice machine & condensing unit prior to installingModel Number on Box
Inspection³Remove carton & inspect ice machine and condensing unit for shipping damage
Remove all PanelsSingle Evaporator - Hinged Front Door Removal³ Loosen Screws on the left and right front panels³ Open the left front door 45 degrees
Remove all PanelsDual Evaporator - Front Panel Removal³ Loosen Screws on the front panel³ The entire front panel lifts up to disengage³ Remove the top
Model/Serial Number LocationBack of Ice MachineInside of Ice Machine
³ Compressor, Condenser,Accumulator and HPCV are Outside³ Line Set is: ³ High Pressure Liquid Line³ Low Pressure Suction Line³ Evaporator, Receiver a
Example Data PlateRefrigerantVoltageManufactured Date Serial Number – NO Date code in new serial numbersModel Number
Warranty RegistrationWebsiteWarranty Registration Form
Level Bin³Thread leveling leg into base of bin³Level the bin to assure the bin door closes and seals properly
³Place the ice machine on top of the bin.³Make sure ice machine is flush with the sides of the bin. Mount on Bin
Ice Machine Wiring³Install strain relief and proper wiring to ice machine head section
Water Connections1” (25.4 mm) min. inside diameter 1” Female PipeThread ------Large CapacityBin Drain 3/4” (19.1 mm) min.inside diameter 3/4” Female P
Water Supply³Do not connect the ice machine to a hot water supply.³If water pressure exceeds the maximum recommended pressure (80 psi), obtain a water
Water Fittings³ Do not apply heat (torch) to the Water Inlet Fitting or Drain Fitting³ Solder Water Connection before installing on ice machine³ Water
Potable Water Supply³Installation with Water Filter³ Install union, additional shut-off is not required³ Copper or plastic tubing may be used³ Refer t
Potable Water Supply³Water Installation without filter³Install union and shut-off valve
Typical QuietQube System Installation
Head Section Drains³ Install 18” Vent Tubes³Ice Machine & Bin drains must be run separately³ Drains Must:³Be run separately³Have a minimum pitch o
Roof Penetration³ Prior to installation of the ice machine head section and CVD® condensing unit be sure that the distance between then is within the
Lift Unit³Trained & qualified personnel are required for rigging and lifting
Curb & Pitch Pockets³ The type of curbs and pitch pockets are dependant on the roofing material.³ Contact a roofing company to install the curb &a
Place Units³ Place condensing units on curb and secure³ An electrician will determine wire size & install disconnect for each condensing unit
Refrigeration System Installation³ The ice machine head section contains refrigerant charge. The ice machine head section contains 3 refrigeration val
CVD Line SetsCVD2075 S2070C CVD1885 S1870C CVD1485CVD1486 S1470C CVD1285 S1200C RC-20 RC-30 RC-50 CVD1185 IB1020C CVD1085 S1000C CVD885 S0850CIB820C R
Line Set Length, Rise & DropLINE SET LENGTH100 feet (30.5 m) Length: The maximum measured length the line set can be. The receiver is designed to
Suction Line Oil Traps0 to 20 feet (0 to 6.1 m) Rise: The ice machine head section has one oil trap built in which allows for a maximum condenser rise
Line Set Installation³ Route refrigeration tubing³ The maximummeasured length the line set can be is 100’ (30.5 m) (no exceptions)³ The maximum amount
Model NumbersThis training covers the following models:CVD1085SD1072CSY1074CCVD2075SD2072CSY2074CCVD1885SD1872CSY1874CCVD1485SD1472CSY1474CCVD1285SD12
Suction Line Oil Traps0 to 20 feet (0 to 6.1 m) Rise: The ice machine head section has one oil trap built in which allows for a maximum condenser rise
Secure Line Set³ Secure Line Set as Needed³ Do not crush/compress insulation
Connect the Line SetIce MachineThe line set can be routed for entry through the top or rear of the ice machine head section.³ Top routing requires the
Connect the Line SetCondensing Unit³ The condensing unit ships from the factory pressurized with a 50/50 mixture of nitrogen/helium. Bleed off pressur
Pressure Test & EvacuateLeave the line set shut off valves closed (front seated). Pressure test the line sets and CVD condensing unit with 150 psi
Open the Valves Prior to StartingOpen The Valves Prior To Starting The Ice Machine.A. Slowly backseat (open-turn counterclockwise) the suction line s
Leak Check the System³ Leak check the new line set connections at the ice machine head section, condensing unit and S trap as well as all factory join
Insulation Requirements3/8 inch (9.5 mm) 5/8 inch(15.9 mm) 3/4” (19mm) Suction Line 1/4” (7mm) Liquid Line 5/8 inch(15.9 mm) 7/8 inch(22.2 mm) 1/2”(13
Refrigerant ChargeThe ice machine is pre-charged with refrigerant. Additional refrigerant may be required on some models, when the line set length is
Final Set-Up
Important Information Prior to InstallationWARNINGPERSONNEL INJURY POTENTIALDo not operate equipment that has been misused, abused, neglected, damaged
Installation Checklist³Complete the installation checklist in the Installation, Use & Care Manual
Complete Installation³Sanitize the Ice Machine³Energize³Verify Water Level³Run 2 Freeze Cycles
S Model QuietQube®Ice Machineswith CVD®TechnologyInstallation QuizClick Here to Launch
Verify Components³Bin³Adapters³Kits³LocationNext verify that you have all the correct components for the ice machine that is being installed
Installation RequirementsThe location selected for the ice machine must meet the following criteria. If any of these criteria are not met, select anot
Head SectionClearances Top 5” (12.7 cm) is recommended for efficient operation and removal of top cover/servicing.Sides 5” (12.7 cm) is recommended fo
Location of Condensing Unit³ The air temperature must be at least -20°F (-28.9°C) but must not exceed 130°F (54.4°C).³ CVD675/CVD1185/CVD2075 Only - T