Manitowoc I0320 Dokumentacja Strona 209

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
Przeglądanie stron 208
Part Number STH025 2/14 209
REMOTE CONDENSER RECOVERY/EVACUATION
1. Press the power button to stop the ice machine.
2. Install manifold gauges, scale and recovery unit or
two-stage vacuum pump.
3. Open high and low side on the manifold gauge
set.
4. Perform recovery or evacuation:
A. Recovery: Operate the recovery unit as
directed by the manufacturer’s instructions.
B. Evacuation prior to recharging: Pull the
system down to 500 microns. Then, allow the
pump to run for an additional hour. Turn off
the pump and perform a standing vacuum
leak check.
NOTE: Check for leaks with an electronic leak
detector after charging the ice machine.
5. Follow the Charging Procedures.
Przeglądanie stron 208
1 2 ... 204 205 206 207 208 209 210 211 212 213 214 ... 271 272

Komentarze do niniejszej Instrukcji

Brak uwag